[t4b-ticker]

Lines 149, 248, 647, 4000, 4001, 4002, 4207, 4404, 4406, 4407, 4408, 4410 and 4705 | Construction work on the Hamburg-Hanover railway line: 01 May - 10 July 2026

From the 01 May 2026 until 10 July 2026 take place as part of the project „Quality offensive 2026“ extensive Track construction work on the railway line between Hamburg and Hanover instead.

The section Hamburg - Lüneburg remains passable to a limited extent, so that the Metronome with an adjusted timetable. As a result, the departure and arrival times will be shifted, in some cases considerably.

➡️ The timetables for bus routes 149, 248, 647, 4000, 4001, 4002, 4207, 4404, 4406, 4407, 4408, 4410 and 4705 will be adjusted accordingly. You can find these here.


Line 4000

Adjustments have been made to speed up the process:

➡️ Garstedt:

  • Stops „Garstedt, Brandweg“ and „Garstedt, Lehmberg East“ are for the most part
  • Bus stop „Garstedt, railway station“ is sent to the Toppenstedter Straße relocated

➡️ Wave:

  • Bus stop „Wave, Mittelweg“ not applicable
  • Replacement: „Welle, Tostedter Straße

➡️ Otter:

  • Bus stop „Otter, Monument“ not applicable
  • Replacement stop in the Kampener Straße / corner of In de Bracken

Line 4705

➡️ Travelling during the period mentioned as Direct connection between „Winsen, Bahnhof“ and „Amazon“
➡️ The stop in Ashausen Not applicable


ℹ️ Please note the changed journey times and connections in the timetable information.