[t4b-ticker]

Line 257 | Construction work in Hamburg-Francop: 9 July – 19 August 2026

From the 9 July 2026 until 19 August 2026 is the Francoper Street in Hamburg-Francop because of Construction work locked.

➡️ There are construction site timetables for the construction site - you can find these at here.

The Line 257 therefore takes a diversion via the Neuwiedenthaler Straßewhich Waltershofer Straße and the Moorburger Elbe dyke.

❌ The stops
Hamburg, Francoper Hinterdeich“,
Hamburg, gardening friends Francoper Straße“ and
Hamburg, Heidemoor
cannot be served.

✅ Passengers please switch to the bus stops
Hamburg, Hohenwisch (bend)“ and
Hamburg, Neuwiedenthaler Straße (West)“ from.