[t4b-ticker]

Line 149 | Construction work in Hamburg-Neuland: 13.03. - 16.03.2026

From the 13 March 2026, 06:00 a.m. until 16 March 2026, 05:00 a.m. is the Large moor arch in Hamburg-Neuland between Großmoorring and Großmoordamm because of Line work closed on one side.

The Journeys 4061, 4141, 4171 and 4271 on route 149 therefore drive the Anti-clockwise lap over uncharted territory. Subsequently, the Neuländer Straße to the existing Diversion route for the Harburg bus system construction project driven.

➡️ The stops
Hamburg, Neuland“,
Hamburg, Neuländer Weg“,
Hamburg, Großmoorbogen“,
Hamburg, Großmoorring“ and
Hamburg, Wohlersweg
during this time on the opposite side of the street served.