From the 1 September 2026 until 22 December 2026 is the Road through the village of Osterbruch because of the Resurfacing of the carriageway and drainage systems closed in a total of six construction phases. First of all, the road through the town is east of the junction with Süderende Road locked.
➡️ The Journey 1005 on route 1082 therefore ends at the stop „Osterbruch, village centre“.
❌ The bus stop „Kehdingbruch, Church“ cannot be served on this journey.