[t4b-ticker]

Line 2007 | Construction work in Stade: 14.12.2025 - 31.07.2027

Since 4 July 2025, half of Harburger Straße in Stade has been closed in the area of the bridge over the railway line towards Bremervörde.
The lines operating there can continue to pass through the construction site.

For the period from 14 December 2025 to 31 July 2027 A construction site timetable with extended journey times will apply. You can find this here. here.

In order to continue to offer passengers a short transfer time in Agathenburg, line 2007 will be split at the „Stade, Airbus-Straße“ and „Stade, Airbus (Eingang)“ stops in future:

  • The regular line ends there in 2007.
  • After a wait of around 10 minutes, a shuttle will continue on to Agathenburg in 2007 to ensure connection to the S-Bahn.

The same rule applies in the opposite direction:
After the shuttle from Agathenburg arrives, there is a waiting time of approximately 10 minutes until the regular line 2007 continues from the „Stade, Airbus/CFK Nord“ stop.