Lines 2060, 2365 and 2726 | Event in Harsefeld: 27.11.2026

On 27 November 2026 between 18:00 and 22:00, Marktstraße in Harsefeld will be closed due to the Nightshopping event. Lines 2060, 2365 and 2726 will therefore take a diversion via Herrenstraße. ➡️ The bus stop „Harsefeld, Marktstraße“ cannot be served during this time, please use the bus stops „Harsefeld, Rathaus“ and „Harsefeld, Bahnhof“ instead.

Read more "

Lines 4037 and 4623 | Construction work in Hollenstedt: 13.04.2026 - 31.03.2027

From 13 April 2026 to 31 March 2027, Dierstorfer Straße in Hollenstedt will be closed due to roadworks. Lines 4037 and 4623 will therefore take a diversion via Am Schäferstieg, Amselweg, Wennerstorfer Kirchweg, Wennerstorfer Weg, Oldendorfer Straße, Estetalstraße, Breitensteiner Allee, Dierstorfer Straße and Am Glockenberg. ➡️ The stops „Dierstorf, Am Schulberg“ (in the direction of Hollenstedt) and „Hollenstedt, Wiesenweg“ cannot be served during this time; please use the stop in the street Am Schäferstieg instead. ℹ️ The „Hollenstedt, Schulzentrum“ stop will be served by all journeys on route 4037, and the stops on the diversion route will also be served if necessary. Addition: 02.07. - 12.08.2026 During this period, the closure will be extended (additional construction phase). Breitensteiner Allee will then also be affected and will no longer be passable. Route 4037 will take an additional diversion via Professor-Kück-Straße, Moisburger Straße and Estetalstraße. ➡️ During this period, the following stops will be cancelled: „Dierstorf, Am Schulberg“ (direction Hollenstedt) „Hollenstedt, Wiesenweg“ „Hollenstedt, Schulzentrum“ „Hollenstedt, Breitensteiner Allee (Süd)“ „Hollenstedt, Breitensteiner Allee“ „Hollenstedt, Siedlung“ Please use the Am Schäferstieg stop and the replacement stop on Estetalstraße instead. ℹ️ The stops on the diversion route will also be served if necessary.

Read more "

Lines 2001, 2018 and 2721 | Construction work in Stade-Hahle: 13.04.2026 - 31.12.2027

From 13 April 2026 to 31 December 2027, the intersection of Drosselstieg, Lerchenweg and Bielfeldtweg in Stade-Hahle will be partially closed in several construction phases due to the construction of a roundabout. There are roadworks timetables for the construction site - you can find them here. In the first construction phase, Lerchenweg north of the junction is closed. Lines 2001 and 2721 will therefore take a diversion via Drosselstieg and Haddorfer Grenzweg. ➡️ The stops „Hahle, Sprehenweg“ and „Hahle, Am Hofacker“ cannot be served during this time, please use the stops „Hahle, Taubenweg“, „Hahle, Drosselstieg“ and „Hahle, Haddorfer Grenzweg“ instead. The 2018 lines will therefore take a diversion via Haddorfer Grenzweg, B73 and Bremervörder Straße. ➡️ The „Hahle, Haddorfer Grenzweg“ stop will be served on the diversion route.

Read more "

Lines 2040, 2043, 2044, 2720 and 2726 | Construction work in Hinterbrack: 24.03. - 31.08.2026

From 24 March 2026 to 31 August 2026, construction work will take place on the Deichsiel in Hinterbrack at the „Hinterbrack, Hinterbrack 7“ stop. Lines 2720 and 2726 will be subject to construction site timetables due to congestion leading to delays. You can find them here. ➡️ The stop „Hinterbrack, Hinterbrack 7“ cannot be served during this time, please use instead: in the direction of Cranz the replacement stop approx. 150 metres to the east in the direction of Jork the stop „Hinterbrack, Wellenstraße“

Read more "

Lines 1044, 1046, 1052, 1053 and 1054 | Construction work in Lamstedt: 30 April – 23 December 2026

From 30 April 2026 to 23 December 2026, Bremervörder Straße and Große Straße in Lamstedt will be closed in several sections due to roadworks. Construction phases 3 and 4 (30 April – 2 July 2026) Construction phases 1 and 2 (12 August – 23 December 2026) During these periods, the roads south of the junction with Feldstraße will be closed. Route 1046 will follow a diversion via Feldstraße and Schützenstraße. ➡️ The „Lamstedt, Pappelweg“ and „Nindorf, Kirchweg“ stops cannot be served. Construction phase 5 (2 July – 14 August 2026) During this period, Große Straße will be closed between the junctions with Mittelstenaher Straße and Kleine Straße. Routes 1044, 1046, 1052, 1053 and 1054 will be diverted via Kleine Straße, Feldstraße and Schützenstraße. ➡️ The stops „Lamstedt, Kirche“, „Lamstedt, Pappelweg“ and „Nindorf, Kirchweg“ cannot be served.

Read more "

Lines 2017, 2026 and 2075 | Construction work in Bützfleth: 08.04.2026 - 08.04.2028

From 8 April 2026 to 8 April 2028, Flethweg in Bützfleth will be closed on one side due to construction work. Lines 2017, 2026 and 2075 will therefore not be able to serve the „Bützfleth, Friedhof“ stop (only exists in the direction of Obstmarschenweg). ➡️ The stop „Bützfleth, Friedhof“ cannot be served during this time, please use the alternative stop on Flethstraße instead, in the direction of travel behind the next bend at house number 7.

Read more "

Routes 2051, 2052, 2054 and 2650 | Construction work in Hollern-Twielenfleth: 20 July – 31 December 2026

From 20 July 2026 to 31 December 2026, Twielenflether Chaussee in Hollern-Twielenfleth will be closed due to roadworks. Route 2051 Diversions (various journeys): Via Hollernstraße – Siebenhöfen – Sandhörn – Am Deich or, additionally, via Sietwende and Mühlenstraße ➡️ Stops not served (depending on the journey): „Hollern, Twielenflether Chaussee“ „Twielenfleth, Twielenflether Chaussee 28“ „Twielenfleth, Ehrenmal“ ➡️ Further details: some services will terminate at „Twielenfleth, Freibad“; some services will bypass Twielenfleth entirely (no detour); some services will follow diversions via Am Deich / Sandhörn / Sietwende ➡️ Replacement service: „Hollern, Twielenfleth junction“ „Twielenfleth, Outdoor Swimming Pool“ Route 2052 ➡️ Some services will operate without the detour to Twielenfleth and remain on Hollernstraße, but will start and end at the „Twielenfleth, Outdoor Swimming Pool“ stop. ➡️ Stops omitted: „Hollern, Twielenflether Chaussee“, „Twielenfleth, Twielenflether Chaussee 28“, „Twielenfleth, Ehrenmal“, „Twielenfleth, Hörne“, „Twielenfleth, Durchweg“, „Steinkirchen, Sandhörn 10“ ➡️ Replacement: „Hollern, Abzweig Twielenfleth“ „Twielenfleth, Freibad“ Route 2054 ➡️ Some services will run via Sietwende / Twielenfleth / Bassenfleth in a different order ➡️ Stops not served: „Twielenfleth, Ehrenmal“, „Twielenfleth, Hörne“ ➡️ Other details: some services will terminate early at „Hollern, Hollernstraße 132“ ➡️ Replacement: „Twielenfleth, Freibad“ Line 2650 ➡️ Diversion via Hollernstraße – Siebenhöfen – Sietwende ➡️ Stops not served: „Twielenfleth, Freibad“ „Twielenfleth, Durchweg“ ➡️ Replacement: „Hollern, Abzweig Twielenfleth“ „Hollern, Siebenhöfen“ ℹ️ Important note: The routes may vary, in some cases significantly, depending on the journey. Please be sure to check the timetable information and notices.

Read more "

Line 2007 | Construction work in Stade: 14.12.2025 - 31.07.2027

Since 4 July 2025, Harburger Straße in Stade has been closed on one side in the area of the bridge over the railway line in the direction of Bremervörde. The lines travelling there can still pass the construction site. For the period from 14 December 2025 to 31 July 2027, a construction site timetable will apply, which provides for extended travel times. You can find it here. To enable passengers to continue to have a short transfer time in Agathenburg, the 2007 line will be split at the stops „Stade, Airbus-Straße“ and „Stade, Airbus (Eingang)“: The regular line 2007 will end there. After a waiting time of around 10 minutes, a 2007 shuttle will continue to Agathenburg to ensure a connection to the S-Bahn. The same applies in the opposite direction: after the arrival of the shuttle from Agathenburg, there is a waiting time of around 10 minutes until the regular 2007 line continues from the „Stade, Airbus/CFK Nord“ stop.

Read more "

Lines 530, 570, 576 and 577 | Construction work in Bremerhaven: 01.08.2025 - 31.10.2028

From 01 August 2025 to 31 October 2028, Weserstraße in Bremerhaven will be closed due to construction work. Lines 530, 570 and 576 will take a diversion via Hoebelstraße, Am Fischbahnhof, Am Lunedeich and Deichhämme and will not be able to serve the stops „Bremerhaven, Wulsdorf-Mitte“ and „Bremerhaven, Deichhämme“. Journey 1001 on route 577 will take a diversion via Porisstraße, Im Felde, Schiffdorfer Chaussee, An der Mühle and Schillerstraße and will not be able to serve the stops „Bremerhjaven, Geestemünde Süd“, „Bremerhaven, Wulsdorf-Mitte“ and „Bremerhaven, Deichhämme“. ➡️ There are construction site timetables for the construction site - you can find them here.

Read more "

Lines 149, 4148, 4200 and 4210 | Construction work in Harburg: 03.06.2024 - 04.11.2026

From 3 June 2024 to 4 November 2026, the bus facility at Harburg station will be closed due to renovation work. Lines 149, 4148, 4200 and 4210 will therefore be rerouted. ➡️ There are construction site timetables for the construction site - you can find them here. In detail: Line 149 in the direction of Harburg will take a diversion via Nartenstraße (which is already being used due to the closure of Brücke des 17. Juni), Veritaskai, Kanalplatz, Harburger Schloßstraße, Seehafenbrücke Harburger Ring and Knoopstraße and will not be able to serve the "Harburg, Bf. Harburg" stop. The stops "Hamburg, Süderelbe (Süd)", "Hamburg, Neuländer Straße", "Hamburg, Schellerdamm", "Hamburg, Kanalplatz", "Hamburg, Harburger Schloßstraße" and "Hamburg, S Harburg Rathaus (Eißendorfer Straße)" will also be served. In order to be able to pick up their journeys in the return direction more quickly, some journeys travel via Bundesstraße 73 and Schloßmühlendamm and serve the stop "Hamburg, S Harburg Rathaus" instead of the stop "Hamburg, S Harburg Rathaus (Eißendorfer Straße)". Individual journeys will serve the stops "Hamburg, Neuland", "Hamburg, Neuländer Weg", "Hamburg, Großmoorbogen (Neuländer See)", "Hamburg, Großmoorring", "Hamburg, Wohlersweg". These journeys cannot serve the "Hamburg, Bf. Harburg" stop either. As a replacement, stop at the alternative stop "Hamburg, Bf. Harburg (Großmoordamm)". From there, individual journeys will travel via Bundesstraße 73, Moorstraße, Wilstorfer Straße and Harburger Ring to the "Hamburg, S Harburg Rathaus" stop, while the others will travel directly back towards Winsen from the replacement stop at Harburg station. Line 149 in the direction of Winsen will take a diversion via Harburger Ring, Seehafenbrücke, Karnapp, Seevestraße, Hannoversche Straße, Neuländer Straße and Nartenstraße and will not be able to serve the "Hamburg, Bf. Harburg" stop. The route via Neuländer Straße and Nartenstraße will be cancelled with the end of the Bridge of 17 June construction project. The stops "Hamburg, S Harburg Rathaus" and "Hamburg, Karnapp" will also be served. Journeys travelling directly from "Hamburg, Bf. Harburg (Großmoordamm)" in the direction of Winsen will travel via the Bundesstraße 73, the Hanover Bridge and Hannoversche Straße. During the closure of Brücke des 17. Juni they will also travel via Neuländer Straße and Nartenstraße. Line 149 cannot operate at all from 15 July to 4 August 2024 due to the Bridge of 17 June construction project. Further information can be found in the announcement on this construction project. Line 4148 will take a diversion via Wilstorfer Straße, Harburger Ring, Knoopstraße, Bremer Straße and Krummholzberg and will not be able to serve the "Hamburg, Bf. Harburg" stop. In the direction of Harburg, the stops "Hamburg, Harburger Ring" and "Hamburg, S Harburg Rathuas" will also be served. In the direction of Jesteburg, the stops "Hamburg, S Harburg Rathaus", "Hamburg, S Harburg Rathaus (Eißendorfer Straße)", "Hamburg, Knoopstraße/Bremer Straße", "Hamburg, Moorstraße" (replacement stop in Wilstorfer Straße) will also be served. Lines 4200 and 4210 will run from Krummholzberg directly onto Harburger Ring to the stop "Hamburg, S Harburg Rathaus" and will not be able to serve the stops "Hamburg, Moorstraße" and "Hamburg, Bf. Harburg". Passengers are requested to use the stops "Hamburg, S Harburg Rathaus" and "Hamburg S Harburg Rathaus (Eißendorfer Straße)".

Read more "