[t4b-ticker]

Line 150 | Construction work in Soltau: 03.07. - 13.08.2025

From the 03 July to 13 August 2025 is the Wiener Strasse in Soltau because of the construction of a crossing aid locked.

➡️ There is a construction site timetable for the construction site - you can find it at here.

The Line 150 therefore takes a diversion via Wolterdingen, Ahlften and Einfrielingen.

➡️ The stops "Soltau, fox farm", "Soltau, North", "Soltau, riding arena" and "Soltau, Reitschulweg" cannot be served during this time.
In addition, the stops "Soltau, Unter den Linden", "Soltau, Parkweg", "Soltau, Einfrielingen" and "Ahlften, Place" served.