Routes 1042 and 1047 | Construction work in Bröckelbeck: 21 September – 2 October 2026

From 21 September 2026 to 2 October 2026, Bröckelbecker Straße in Bröckelbeck will be closed due to renovation works. Route 1042: Route 1042 will be diverted via Nordhoopstraße, Dorfstraße, Lindenstraße, Ahrensfluchter Moor and Dobrock. ❌ Services 1001, 1004 and 1008 will not be able to serve the following stops: „Wingst-Weißenmoor, J.A.-Meyer-Weg“, „Wingst-Weißenmoor, Friedhof“, „Bröckelbeck, Ort“, „Bröckelbeck, Haus Nr. 10“, „Westersode, Nordhoopstraße“ ➡️ Service 1003 will serve „Wingst-Weißenmoor, J.A.-Meyer-Weg“ and „Wingst-Weißenmoor, Friedhof“ in place of service 1001. Route 1003 is unable to serve the stops „Bröckelbeck, village“, „Bröckelbeck, House No. 10“ and „Westersode, Nordhoopstraße“. ℹ️ Passengers on services 1004 and 1008 to Weißenmoor should please change to service 1063 at „Wingst-Dobrock, GS Am Wingster Wald“. Route 1047 Route 1047 is following a diversion via Nordhoopstraße, Dorfstraße, Lindenstraße, Ahrensfluchter Moor, Dobrock, Weißenmoor, Lamstedter Straße and Heerweg. ❌ The following stops cannot be served: „Bröckelbeck, House No. 10“ „Westersode, Westersoder Straße“ „Westersode, Nordhoopstraße“ ✅ A temporary stop will be set up on Nordhoopstraße for the „Westersode, Nordhoopstraße“ stop.

Lines 530, 570 and 574 | Event in Hagen im Bremischen: 18–20 September 2026

From 18 September 2026, 5.00 pm, until 20 September 2026, the area around the „Hagen, Schulzentrum“ bus stop in Hagen im Bremischen will be closed due to the autumn market. Bus routes 530, 570 and 574 will be diverted via Am Amtsholz, Auf der Wurth and Amselweg. ❌ The „Hagen, Schulzentrum“ stop cannot be served. ✅ Passengers should use the alternative stop on Am Amtsholz.

Line 1004 | Event in Cuxhaven: 21 September – 9 October 2026

From 21 September 2026 to 9 October 2026, Otto-Reubold-Straße in Cuxhaven will be closed due to the Autumn Flea Market. ❌ Bus route 1004 will not be able to serve the „Cuxhaven, Lappestraße“ and „Cuxhaven, Ritzebütteler Marktplatz“ stops. ✅ Passengers are advised to use the „Cuxhaven, Schloß Ritzebüttel“ stop instead.

Routes 1043, 1070 and 1072 | Construction work in Oberndorf: 7 September – 2 October 2026

From 7 September 2022 to 2 October 2022, sections of Zollbaum, Bentwisch and Niederstrich in Oberndorf will be closed due to roadworks. ➡️There are special timetables for the roadworks – you can find them here. Route 1070 | 7–13 September 2026 The route will be diverted via Bentwisch, Niederstrich, Großes Wegfähreis and Landstraße. ❌ The stops „Oberndorf, Zehntweg“, „Oberndorf, Hasenfleet 6“, „Oberndorf, Moordeich“, „Oberndorf, Zollbaum“, „Oberndorf, Schwarzenmoor 6“ and „Oberndorf, Schwarzenmoor 10a“ cannot be served. Route 1070 | 14 September – 2 October 2026 The route is diverted via Schwarzenmoor. ❌ The stops „Oberndorf, Zollbaum“ and „Oberndorf, Moordeich“ cannot be served. Route 1043 | 14 September – 20 September 2026 The route will not run via Niederstrich. ❌ The stops „Osten, Niederstrich 30“, „Osten, Niederstrich 4“ and „Osten, Niederstrich 13“ cannot be served. Route 1072 ℹ️ Due to a diversion, route 1072 is operating on a construction-related timetable.

Routes 1061, 1065 and 1082 | Construction work in Osterbruch: 15 September – 22 December 2026

From 15 September 2026 to 22 December 2026, the road through Osterbruch will be closed in a total of six construction sections due to resurfacing work and the renewal of drainage systems. Initially, the road through the village will be closed east of the junction with Süderende. ➡️ As a result, bus route 1082 will terminate at the „Osterbruch, Abzweig Norderende“ stop. ❌ The stops „Kehdingbruch, Kirche“ and „Osterbruch, Ortsmitte“ cannot be served by this route. ℹ️ Journey 1005 on route 1082 continues as journey 1107 on route 1065 to Neuhaus (Oste) and, to this end, takes a diversion after the „Osterbruch, Abzweig Norderende“ stop via Dorfstraße, Scholienstraße and the B73. ℹ️ Due to the diversion, route 1061 will operate on a construction-related timetable.

Route 578 | Construction work in Hohewurth: 17 August – 23 September 2026

From 17 August 2026 to 23 September 2026, the carriageway of the B71 towards Hohewurth will be closed due to renovation work on the drinking water pipeline. ➡️There is a special timetable for the roadworks – you can find it here. As a result, bus route 578 towards Loxstedt will be diverted via Dünenfährstraße, Mushardstraße and Hohewurthstraße. ❌ The „Nückel, B71“ stop cannot be served when travelling towards Loxstedt.

Lines 558 and 559 | Construction work in Beverstedt-Taben: 10 August – 3 December 2026

From 10 August 2026 to 3 December 2026, the B71 in Beverstedt-Taben will be closed due to road resurfacing works. ➡️ There are special timetables for the roadworks – you can find them here. As a result, services on routes 558 and 559 will be diverted via Alte Bundesstraße, the B71, Meyerhofstraße, Appelner Straße, Beverstedter Straße, Alte Dorfstraße, Kirchwistedter Straße and Über der Lune. Route 559 ❌ The stops „Beverstedt, Logestraße/Aldi“, „Beverstedt, Galgenberg“, „Taben, Ringe“, „Taben, Betonwerk“ and „Kirchwistedt, Stemmermühlen junction B71“ cannot be served. Route 558 ❌ The stops „Taben, Betonwerk“ and „Taben, Ringe“ cannot be served. ➡️ Journey 1002 will also be unable to serve the stops „Beverstedt, Galgenberg“, „Beverstedt, Logestraße/Aldi“ after the round trip, and „Beverstedt, Rathaus“.

Lines 575, 576 and 577 | Construction work in Bremerhaven: 04.05. - 28.08.2026

From Monday, 4 May until probably 28 August 2026, the railway subway in Schiffdorfer Chaussee in Bremerhaven near the main railway station will be closed due to construction work. Bus routes 575, 576 and 577 will take a diversion and will not be able to serve the stops „Bremerhaven, Bürgerpark“ and „Bremerhaven, SZ Carl von Ossietzky“. The stop „Bremerhaven, Hauptbahnhof“ will serve as a replacement. There are construction site timetables for the construction site. You can find them here.

Lines 1044, 1046, 1052, 1053 and 1054 | Construction work in Lamstedt: 30 April – 23 December 2026

From 30 April 2026 to 23 December 2026, Bremervörder Straße and Große Straße in Lamstedt will be closed in several sections due to roadworks. Construction phases 3 and 4 (30 April – 2 July 2026) Construction phases 1 and 2 (12 August – 23 December 2026) During these periods, the roads south of the junction with Feldstraße will be closed. Bus route 1046 will follow a diversion via Feldstraße and Schützenstraße. ➡️ The bus stops „Lamstedt, Pappelweg“ and „Nindorf, Kirchweg“ cannot be served. Construction phase 5 (2 July – 14 August 2026) During this period, Große Straße will be closed between the junctions with Mittelstenaher Straße and Kleine Straße. Routes 1044, 1046, 1052, 1053 and 1054 will follow a diversion via Kleine Straße, Feldstraße and Schützenstraße. ➡️ The stops „Lamstedt, Kirche“, „Lamstedt, Pappelweg“ and „Nindorf, Kirchweg“ cannot be served.

Lines 530, 570, 576 and 577 | Construction work in Bremerhaven: 01.08.2025 - 31.10.2028

From 01 August 2025 to 31 October 2028, Weserstraße in Bremerhaven will be closed due to construction work. Lines 530, 570 and 576 will take a diversion via Hoebelstraße, Am Fischbahnhof, Am Lunedeich and Deichhämme and will not be able to serve the stops „Bremerhaven, Wulsdorf-Mitte“ and „Bremerhaven, Deichhämme“. Journey 1001 on route 577 will take a diversion via Porisstraße, Im Felde, Schiffdorfer Chaussee, An der Mühle and Schillerstraße and will not be able to serve the stops „Bremerhjaven, Geestemünde Süd“, „Bremerhaven, Wulsdorf-Mitte“ and „Bremerhaven, Deichhämme“. ➡️ There are construction site timetables for the construction site - you can find them here.