From Monday, 4 August 2025 until probably 17 January 2026, the through road (Bundesstraße 73) in Düdenbüttel will be renovated in several construction phases with half-side closures. ➡️ There are roadworks timetables for the construction site - you can find them here. The third construction phase will begin on 15 October 2025. Construction phases 2 and 3 will take place simultaneously from this date. The entrance and exit from Heinbockeler Straße onto Bundesstraße 73 will not be possible during the works.➡️ The bus stop „Düdenbüttel, Heinbockeler Straße“ will be cancelled. Replacement stops have been set up in both directions. Lines 2018, 2028, 2068, 2069 and 2721 will take a diversion in the direction of Heinbockel via Querweg. Lines 1824, 2018, 2027, 2028, 2068, 2069, 2721 and 2722 will take a diversion in the direction of Stade via An der Loge, Röthkampstraße and Osterfeldstraße and will also not be able to serve the „Düdenbüttel, Im Klamm“ stop. An alternative stop has been set up in Osterfeldstraße.