[t4b-ticker]

Category: Fahrplanabweichungen

Lines 4621, 4643, 4644 and 4860 | Construction work in Wüstenhöfen: 09.03. - 29.05.2026

From 9 March 2026 to 29 May 2026, the „Wüstenhöfen, Abzweig Dohren“ stop in the direction of Dohren and Tostedt will be relocated due to pipeline work. ➡️ The bus stop „Wüstenhöfen, Abzweig Dohren“ cannot be served at its usual location during this time, please use instead: the replacement stop on Wüstenhöfener Aue (direction Dohren) the replacement stop on Wüstenhöfener Dorfstraße, south of the junction to Wüstenhöfener Aue (direction Tostedt)

Read more "

Line 2007 | Construction work in Stade: 14.12.2025 - 31.07.2027

Since 4 July 2025, half of Harburger Straße in Stade has been closed in the area of the bridge over the railway line towards Bremervörde. The lines operating there can still pass the construction site. A construction site timetable with extended travel times will be in effect from 14 December 2025 to 31 July 2027. You can find it here. In order to continue to offer passengers a short transfer time in Agathenburg, line 2007 will in future be split at the „Stade, Airbus-Straße“ and „Stade, Airbus (Eingang)“ stops: the regular 2007 line will terminate there. After a waiting time of around 10 minutes, a shuttle 2007 will continue to Agathenburg to ensure connection to the S-Bahn. The same rule applies in the opposite direction: after the shuttle from Agathenburg arrives, there is a waiting time of around 10 minutes until the regular 2007 line continues from the „Stade, Airbus/CFK Nord“ stop.

Read more "

Lines 257, 2040, 2043, 2044 and 2724 | Construction work in Hamburg-Cranz: 13.10. - 19.12.2025 and 19.01. - 30.05.2026

From 13 October 2025 to 19 December 2025 and from 19 January 2026 to 30 May 2026, the Estedeich road in Hamburg-Cranz will be closed due to construction work. ➡️ There are construction site timetables for the construction site - you can find them here. Cancelled stops (all lines) „Hamburg, Cranz (ferry)“ „Hamburg, Altes Estesperrwerk“ Replacement and alternative stops „Hamburg, Cranzer Elbdeich (Ost)“ (lines 257, 2040) „Hamburg, Estebogen“ (line 2044) „Estebrügge, GS an der Este“ (line 2040, journeys 1021, 1023, 1029) Replacement stop Cranzer Elbdeich, Höhe Hausnr. 11 (line 2040, all journeys) Line-related regulations Line 257 journeys from/to „Cranz, Estebogen“ start/end at „Cranzer Elbdeich (Ost)“ as an alternative. Diversion via Cranzer Elbdeich and Cranzer Hauptdeich. Line 2040 All journeys: Service to the replacement stop Cranzer Elbdeich 11. Journeys 1021, 1023, 1029 and 9005: „Estebrügge, Ortsmitte“ cancelled. Replacement: „Estebrügge, GS an der Este“. Diversion via Buxtehuder Straße and Hinterstraße. Line 2043 afternoon journeys: additional service from „Borstel, Hinter der Mühle 33a“ „Jork, Kohlenhusen (Wendeplatz)“ „Hinterbrack, Wellenstraße“ „Hinterbrack, Hinterbrack 7“ „Hamburg, Cranzer Elbdeich (West)“ New journey 1020 from „Hamburg, Cranzer Elbdeich (West)“ via Borstel to Jork. Diversion route via Kohlenhusen - Hinterbrack - Cranzer Elbdeich - Cranzer Hauptdeich. Line 2044 in the morning: direct journey „Jork, Marktplatz“ → „Hamburg, Estebogen“ via Osterjork, Obstmarschenweg, Königreicher Straße, Leeswig. Then normal route. Afternoon: Return direction same diversion route. Stops to be cancelled include: „Borstel (STD), Struckweg“ „Borstel (STD), Hinter der Mühle 11 / 33a“ „Jork, Kohlenhusen (Wendeplatz)“ „Hinterbrack, Wellenstraße / Hinterbrack 7“ „Hamburg, Cranzer Elbdeich (West)“ „Hamburg, Cranz (Fähre)“ „Hamburg, Altes Estesperrwerk“ Route 2724 diversion via Neuenfelder Straße - Nincoper Straße - Marschkamper Deich - Neuenfelder Fährdeich - Neuenfelder Damm. Stops cancelled: „Königreich, Königreicher Straße 73“ „Königreich, Wellenstraße“ „Königreich, Leeswig 47“ „Königreich, Leeswig 101“ „Hamburg, Sperrwerk Estemündung“

Read more "

Lines 530, 570, 576 and 577 | Construction work in Bremerhaven: 01.08.2025 - 31.10.2028

From 01 August 2025 to 31 October 2028, Weserstraße in Bremerhaven will be closed due to construction work. Lines 530, 570 and 576 will take a diversion via Hoebelstraße, Am Fischbahnhof, Am Lunedeich and Deichhämme and will not be able to serve the stops „Bremerhaven, Wulsdorf-Mitte“ and „Bremerhaven, Deichhämme“. Journey 1001 on route 577 will take a diversion via Porisstraße, Im Felde, Schiffdorfer Chaussee, An der Mühle and Schillerstraße and will not be able to serve the stops „Bremerhjaven, Geestemünde Süd“, „Bremerhaven, Wulsdorf-Mitte“ and „Bremerhaven, Deichhämme“. ➡️ There are construction site timetables for the construction site - you can find them here.

Read more "

Lines 2063, 2064 and 2433 | Construction work between Bliedersdorf and Nottensdorf: 14.08.2025 - 31.07.2026

From 14 August 2025 to 31 July 2026, Nottensdorfer Straße between Bliedersdorf and Nottensdorf will be closed due to cycle path construction. ➡️Zu there are roadworks timetables for this construction site - you can find them here. Lines 2063, 2064 and 2433 are therefore taking a diversion via Hauptstraße, Rutenbeck, Grundoldendorf and Landstraße 130. ➡️ The stops - „Bliedersdorf, Dohrenstraße“ - „Bliedersdorf, Lahmsbeck“ - „Bliedersdorf, Grundschule“ cannot be served during this time. ✅ Passengers should switch to the „Bliedersdorf, Hummelbeckweg“ stop.📍 An alternative stop will be set up for the „Bliedersdorf, Grundschule“ stop in a bend before the end of the village, which will be served by routes 2064 and 2433.

Read more "

Lines 575, 576 and 577 | Construction work in Bremerhaven: 01.08.2025 - 31.07.2026

From 1 August 2025 to 31 January 2026, the Bremerhaven-Wulsdorf motorway slip road in Bremerhaven will be closed due to construction work. Routes 575, 576 and 577 will take a diversion via Donnern, Böcken, Sellstedt, Pennhop, Friedheim and Schiffdorf. The „Hohewurth, B 71“ stop cannot be served. ➡️ There are roadworks timetables for the roadworks - you can find them here.

Read more "

Lines 4621, 4640, 4641, 4642, 4643, 4644, 4801, 4870, 4887, 4888 and 4889 | Construction work in Tostedt: 07.04.2025 - 06.06.2026

From 7 April 2025 to 31 July 2026, federal road 75, country road 141 and district road 57 in Tostedt will be closed in several construction phases due to the construction of a roundabout. ➡️ There are roadworks timetables for the construction site - you can find them here. The following routes will be running during the construction period, some of them with extensive diversions: 🚍 Route 4621 (journeys 2107, 2109, 2121, 2102, 2120, 2106, 2110, 2116, 2118):➡️ Diversion via Poststraße, Im Stocken, Glüsinger Weg, Tostedter Straße and Harburger Straße✅ Also served: „Tostedt, Glüsinger Weg“, „Todtglüsingen, Denkmal“📍 The „Tostedt, GS Poststraße“ stop will be relocated to Baumschulenweg for journeys coming from Todtglüsingen. 🚍 Line 4640 (journeys 2560 and 2564):✅ Also stops at the replacement stop „Tostedt, GS Poststraße“ in Baumschulenweg 🚍 Line 4641:- Journey 2601 is extended to the stop „Tostedt, GS Poststraße“ - Journey 2619 takes a diversion via Harburger Straße and serves „Todtglüsingen, GS Lohberger Straße“ instead of „Todtglüsingen, Denkmal“.- Journeys 2602, 2612, 2622, 2626 (direction Otter) travel via Glüsinger Weg, Im Stocken, Poststraße✅ Serve the replacement stop „Tostedt, GS Poststraße“ in Baumschulenweg 🚍 Line 4642 (journeys 2653, 2652, 2654, 2651):➡️ Diversion via Poststraße, Im Stocken, Glüsinger Weg, Tostedter Straße, Harburger Straße✅ Journey 2653 also serves: „Tostedt, Glüsinger Weg“✅ Journeys 2652, 2654 also serve: „Todtglüsingen, Denkmal“🔁 Journey 2651 serves „Todtglüsingen, GS Lohberger Straße“ instead of „Todtglüsingen, Denkmal“ 🚍 Line 4643 (journey 2692):➡️ Diversion via Harburger Straße, Tostedter Straße, Glüsinger Weg, Im Stocken, Poststraße✅ Also serves: „Todtglüsingen, Denkmal“✅ Also serves: replacement stop „Tostedt, GS Poststraße“ in Baumschulenweg 🚍 Line 4644 (journeys 2707, 2701, 2717, 2711, 2713, 2702, 2704, 2712):➡️ Diversion via Im Stocken and Glüsinger Weg❌ „Tostedt, Todtglüsinger Straße Feuerwehr“ stop cancelled📍 „Tostedt, Bertha-von-Suttner-Weg“ stop relocated to Glüsinger Weg (northern end)✅ „Tostedt, Glüsinger Weg“ stop additionally bedient➡️ Journey 2712: Diversion via Harburger Straße and Niedersachsenstraße✅ Serves „Tostedt, Bahnhof“ as second stop✅ Serves the replacement stop „Tostedt, GS Poststraße“ in Baumschulenweg (for 2712 as third stop) 🚍 Line 4801 (not on 18. May 2026 06:30 - 15:00):➡️ Diversion via Poststraße, Im Stocken, Glüsinger Weg❌ „Tostedt, Todtglüsinger Straße Feuerwehr“ stop omitted📍 „Tostedt, Bertha-von-Suttner-Weg“ stop relocated to Glüsinger Weg (northern end)✅ Also served: „Tostedt, Glüsinger Weg“, „Tostedt, GS Poststraße“ 🚍 Line 4870 (journeys 3105, 3107, 3109, 3111, 3113, 3102, 3104) (not on 18. May 2026 06:30 - 15:00):➡️ Diversion via Glüsinger Weg, Im Stocken, Poststraße❌ „Tostedt, Todtglüsinger Straße Feuerwehr“ stop cancelled📍 „Tostedt, Bertha-von-Suttner-Weg“ stop relocated to Glüsinger Weg (northern end)✅ Also served: „Tostedt, Glüsinger Weg“, „Tostedt, GS Poststraße“ 🚍 Line 4887 (journeys 3152, 3154):➡️ Diversion via Harburger Straße, Tostedter Straße, Glüsinger Weg, Im Stocken, Poststraße✅ Also serves: „Todtglüsingen, Denkmal“, „Tostedt, Glüsinger Weg“ 🚍 Line 4888:➡️ Direction Tostedt: Diversion via Glüsinger Weg, Im Stocken, Poststraße- Journey 3203 comes via B75 and Harburger Straße✅ Serves: „Todtglüsingen, Denkmal“, replacement stop „Tostedt, GS Poststraße“ in Baumschulenweg (instead of regular stop)- Journey 3208: diversion via Harburger Straße, Niedersachsenstraße, Im Stocken, Glüsinger Weg, Tostedter Straße✅ Also serves: „Tostedt, Homann / Altenheim“, replacement stop „Bertha-von-Suttner-Weg“ in Glüsinger Weg (north end) 🚍 Line 4889 (journey 3226):➡️ Diversion via Glüsinger Weg, Im Stocken, Poststraße✅ Also serves: „Tostedt, Glüsinger Weg“✅ Ends at the replacement stop „Tostedt, GS Poststraße“ in Baumschulenweg instead of the regular stop Addition: New construction phase from 19 May 2026.05.2026 The construction work will be extended from 19 May to 10 June 2026. Kastanienallee (B75) will be closed between the new roundabout and Poststraße. ➡️ Journeys on routes 4643, 4644 and 4860, which travel to and from Dohren via Buxtehuder Straße, will use a diversion via Todtglüsinger Straße, Glüsinger Weg, Im Stocken, Poststraße and Freudenthalstraße. ❌ The bus stop „Tostedt, Am Sande“ cannot be served. ✅ The stops on the diversion route will be served additionally if necessary. ℹ️ All previous diversions will remain in place.

Read more "

Lines 2001, 2004, 2012, 2018, 2021, 2025, 2026, 2037, 2051, 2060, 2061, 2365, 2370, 2372 and 2376 | Construction work in Stade: 02.04.2024 - 30.06.2028

From 2 April 2024 to 30 June 2028, Harsefelder Straße in Stade will be closed in 9 construction phases due to renovation work on the cycle path, footpath and retention channel. ➡️ There are roadworks timetables for the construction site - you can find them here. In detail: From 15 August 2025 to 30 June 2026, Harsefelder Straße in Stade will be closed on one side at the junction with Holtermannstraße due to construction work (construction sections 4 and 5). The above-mentioned lines will therefore take a diversion in the direction of Stade railway station via Am Exerzierplatz, Timm-Kröger-Straße, Am Schäferstieg, Holtermannstraße and Im Neuwerk. ➡️ The stops „Stade, Bf. Stade“, „Stade, Teichstraße“ and „Stade, Brauerstraße“ cannot be served in the direction of the railway station; instead, please use the stops „Stade, Sachsenstraße (West)“, „Stade, Am Exerzierplatz“, „Stade, Timm-Kröger-Straße“ and the replacement stop in Im Neuwerk at the junction with Harsefelder Straße. ℹ️ Note: Out of town, the lines continue to run as normal. Addition: Line 2021 (30.03. - 10.07.2026) Line 2021 can no longer turn from Thuner Straße into Harsefelder Straße and therefore runs two diversions: 1st section:After the „Wiepenkathen, Am Steinkamp“ stop, the route runs directly via the B73 to Ottenbeck.➡️ The „Stade, Thuner Straße“ stop is also served. Section 2: After the „Stade, Schwabensee“ stop, there will be a diversion via Sachsenstraße, Harsefelder Straße and B73.➡️ The stops „Stade, Sachsenstraße (KVG)“, „Stade, Frankenweg“ and „Stade, Sachsenstraße (Mitte)“ will be served in reverse order. ➡️ The stops „Stade, Athenaeum“, „Stade, Sachsenstraße (Mitte)“, „Stade, Harburger Straße (KVG)“, „Stade, Berliner Platz“ and „Stade, Bahnhof (Hansebrücke)“ cannot be served during this time. From 18 May 2026, the stop „Stade, Jobelmannstraße“ cannot be served. This affects lines 2005, 2021 and 2721.

Read more "

Lines 2026 and 2075 | Closure in Bützfleth: 11 September 2024 to 31 December 2026

Erlenweg in Bützfleth will be closed from 11 September 2024 to 31 December 2026 due to a dilapidated bridge. ➡️ There are construction site timetables for the construction site – you can find them here. In detail: Routes 1027, 1135, 1047 and 1041 of line 2026 will remain on Obstmarschenweg and will not be able to serve the stops „Bützfleth, Friedhof“, „Bützfleth, Pappelstieg“ and “Bützfleth, Holunderweg„. Passengers are requested to use the “Bützfleth, Kirche„ stop instead. Routes 1010 and 1018 will be diverted via Moorchaussee, turning at the junction with Landernweg, and will not be able to serve the “Bützfleth, Holunderweg„ stop. Passengers are requested to use the replacement stop on Flethstraße near house number 101. Line 2075 will remain on Moorchaussee and will not be able to serve the “Bützfleth, Holunderweg" stop. Passengers are requested to use the replacement stop on Flethstraße near house number 101.

Read more "