[t4b-ticker]

Lines 5120 and 5925 | Construction work between Scharnebeck and Lentenau: 18.11. - 19.11.2025

From the 18 November 2025 until 19 November 2025 is the District road 28 between Scharnebeck and Lentenau because of a Road surface rehabilitation locked.

➡️ There are construction site timetables for the construction site - you can find them here.

The Line 5120 therefore takes a diversion via Rullstorf, Boltersen and Sülbeck and can reach the stop „Lentenau, K 28“ do not operate.

The Line 5925 drives from Scharnebeck directly after Erbstorf (or journey 1015 to Adendorf) and can use the stops „Lentenau, K 28“ and „Nutzfelde, Am Walde“ do not operate.