From 29 July 2024 to 30 June 2025, country road 124 between Ahlerstedt and Hollenbeck will be closed due to roadworks. Lines 2060, 2061, 2303, 2368 and 2369 will therefore be detoured.
➡️ There are construction site timetables for the construction site - you can find these at here.
In detail:
Lines 2060, 2061, 2303, 2368 and 2369 will take a diversion via Im Drauen, Bockholt and Kakerbecker Straße and will not be able to serve the stops "Hollenbeck, Forsthaus", "Ahlerstedt, Holzhäuser Straße" and in the direction of Zeven "Ahlerstedt, Kakerbecker Straße". Passengers travelling in the direction of Zeven should change to the "Ahlerstedt, Stader Straße" stop. Passengers travelling in the direction of Harsefeld should change to the "Ahlerstedt, Kakerbecker Straße" stop.