[t4b-ticker]

Line 2035 | Construction work in Ahrensmoor: 16.07. - 17.07.2025

From the 16 July to 17 July 2025 is the Ahlerstedter Weg in Ahrensmoor because of Construction work locked.

The Line 2035 therefore takes a diversion via the County road 75.

➡️ The bus stop "Ahrensmoor-West, Ahlerstedter Weg" cannot be operated during this time.
Please use the bus stop instead "Ahrensmoor-North, Schlangenweg".