[t4b-ticker]

Lines 2024, 2037, 2072 and 2075 | Construction work in Drochtersen: 04.08.2025 - 29.05.2026

From the 4 August 2025 to 29 May 2026 (expected) is the Aschhorner Road in Drochtersen because of Construction work locked.
➡️ The KVG lines will be affected from 14 August 2025.


🚍 Lines 2024, 2072 and 2075
➡️ take a diversion via the Dornbusch district.
No stops will be omitted.


🚍 Line 2037
➡️ serves from the direction of Stade all stops until „Aschhorn 12“,
then turns at the bus stop „Aschhorn, Black Path“
and drives over the Ritschermoor Road back to Ritsch,
to continue on the regular route from there.

❌ The bus stop „Drochtersen, church“ cannot be operated during this time.