[t4b-ticker]

Line 2433 | Construction work in Bliedersdorf: 03.07. - 13.08.2025

From the 03 July to 13 August 2025 is the Nottensdorfer Straße in Bliedersdorf because of Construction work locked.

The Line 2433 therefore takes a diversion via Rutenbeck and Grundoldendorf.

➡️ The stops "Bliedersdorf, Dohrenstraße" and "Bliedersdorf, Lahmsbeck" cannot be served during this time.
Please use the bus stop instead "Bliedersdorf, Hummelbeckweg".