[t4b-ticker]

Category: Fahrplanabweichungen

Routes 2051, 2052, 2054 and 2650 | Construction work in Hollern-Twielenfleth: 20 July – 31 December 2026

From 20 July 2026 to 31 December 2026, Twielenflether Chaussee in Hollern-Twielenfleth will be closed due to roadworks. Route 2051 diversions (various services): Via Hollernstraße – Siebenhöfen – Sandhörn – Am Deich or, additionally, via Sietwende and Mühlenstraße ➡️ Stops not served (depending on the service): „Hollern, Twielenflether Chaussee“ „Twielenfleth, Twielenflether Chaussee 28“ „Twielenfleth, Ehrenmal“ ➡️ Other details: some services end at „Twielenfleth, Freibad“; some services skip Twielenfleth entirely (no detour); some services take diversions via Am Deich / Sandhörn / Sietwende ➡️ Replacement service: „Hollern, Twielenfleth junction“ „Twielenfleth, Outdoor Swimming Pool“ Route 2052 ➡️ Some services will operate without the detour to Twielenfleth and will remain on Hollernstraße, but will start and end at the „Twielenfleth, Outdoor Swimming Pool“ stop. ➡️ Stops omitted: „Hollern, Twielenflether Chaussee“, „Twielenfleth, Twielenflether Chaussee 28“, „Twielenfleth, Ehrenmal“, „Twielenfleth, Hörne“, „Twielenfleth, Durchweg“, „Steinkirchen, Sandhörn 10“ ➡️ Replacement: „Hollern, Abzweig Twielenfleth“ „Twielenfleth, Freibad“ Route 2054 ➡️ Some services will run via Sietwende / Twielenfleth / Bassenfleth in a revised order ➡️ Stops omitted: „Twielenfleth, Ehrenmal“, „Twielenfleth, Hörne“ ➡️ Other details: some services will terminate early at „Hollern, Hollernstraße 132“ ➡️ Replacement: „Twielenfleth, Freibad“ Line 2650 ➡️ Diversion via Hollernstraße – Siebenhöfen – Sietwende ➡️ Stops omitted: „Twielenfleth, Freibad“ „Twielenfleth, Durchweg“ ➡️ Replacement: „Hollern, Abzweig Twielenfleth“, „Hollern, Siebenhöfen“ ℹ️ Important note: The routes may vary, in some cases significantly, depending on the journey. Please be sure to check the timetable information and notices.

Read more "

Lines 149, 4148, 4200 and 4210 | Construction work in Harburg: 03.06.2024 - 04.11.2026

From 3 June 2024 to 4 November 2026, the bus facility at Harburg station will be closed due to renovation work. Lines 149, 4148, 4200 and 4210 will therefore be rerouted. ➡️ There are construction site timetables for the construction site - you can find them here. In detail: Line 149 in the direction of Harburg will take a diversion via Nartenstraße (which is already being used due to the closure of Brücke des 17. Juni), Veritaskai, Kanalplatz, Harburger Schloßstraße, Seehafenbrücke Harburger Ring and Knoopstraße and will not be able to serve the "Harburg, Bf. Harburg" stop. The stops "Hamburg, Süderelbe (Süd)", "Hamburg, Neuländer Straße", "Hamburg, Schellerdamm", "Hamburg, Kanalplatz", "Hamburg, Harburger Schloßstraße" and "Hamburg, S Harburg Rathaus (Eißendorfer Straße)" will also be served. In order to be able to pick up their journeys in the return direction more quickly, some journeys travel via Bundesstraße 73 and Schloßmühlendamm and serve the stop "Hamburg, S Harburg Rathaus" instead of the stop "Hamburg, S Harburg Rathaus (Eißendorfer Straße)". Individual journeys will serve the stops "Hamburg, Neuland", "Hamburg, Neuländer Weg", "Hamburg, Großmoorbogen (Neuländer See)", "Hamburg, Großmoorring", "Hamburg, Wohlersweg". These journeys cannot serve the "Hamburg, Bf. Harburg" stop either. As a replacement, stop at the alternative stop "Hamburg, Bf. Harburg (Großmoordamm)". From there, individual journeys will travel via Bundesstraße 73, Moorstraße, Wilstorfer Straße and Harburger Ring to the "Hamburg, S Harburg Rathaus" stop, while the others will travel directly back towards Winsen from the replacement stop at Harburg station. Line 149 in the direction of Winsen will take a diversion via Harburger Ring, Seehafenbrücke, Karnapp, Seevestraße, Hannoversche Straße, Neuländer Straße and Nartenstraße and will not be able to serve the "Hamburg, Bf. Harburg" stop. The route via Neuländer Straße and Nartenstraße will be cancelled with the end of the Bridge of 17 June construction project. The stops "Hamburg, S Harburg Rathaus" and "Hamburg, Karnapp" will also be served. Journeys travelling directly from "Hamburg, Bf. Harburg (Großmoordamm)" in the direction of Winsen will travel via the Bundesstraße 73, the Hanover Bridge and Hannoversche Straße. During the closure of Brücke des 17. Juni they will also travel via Neuländer Straße and Nartenstraße. Line 149 cannot operate at all from 15 July to 4 August 2024 due to the Bridge of 17 June construction project. Further information can be found in the announcement on this construction project. Line 4148 will take a diversion via Wilstorfer Straße, Harburger Ring, Knoopstraße, Bremer Straße and Krummholzberg and will not be able to serve the "Hamburg, Bf. Harburg" stop. In the direction of Harburg, the stops "Hamburg, Harburger Ring" and "Hamburg, S Harburg Rathuas" will also be served. In the direction of Jesteburg, the stops "Hamburg, S Harburg Rathaus", "Hamburg, S Harburg Rathaus (Eißendorfer Straße)", "Hamburg, Knoopstraße/Bremer Straße", "Hamburg, Moorstraße" (replacement stop in Wilstorfer Straße) will also be served. Lines 4200 and 4210 will run from Krummholzberg directly onto Harburger Ring to the stop "Hamburg, S Harburg Rathaus" and will not be able to serve the stops "Hamburg, Moorstraße" and "Hamburg, Bf. Harburg". Passengers are requested to use the stops "Hamburg, S Harburg Rathaus" and "Hamburg S Harburg Rathaus (Eißendorfer Straße)".

Read more "

Lines 2026 and 2075 | Closure in Bützfleth: 11 September 2024 to 31 December 2026

Erlenweg in Bützfleth will be closed from 11 September 2024 to 31 December 2026 due to a dilapidated bridge. ➡️ There are construction site timetables for the construction site – you can find them here. In detail: Routes 1027, 1135, 1047 and 1041 of line 2026 will remain on Obstmarschenweg and will not be able to serve the stops „Bützfleth, Friedhof“, „Bützfleth, Pappelstieg“ and “Bützfleth, Holunderweg„. Passengers are requested to use the “Bützfleth, Kirche„ stop instead. Routes 1010 and 1018 will be diverted via Moorchaussee, turning at the junction with Landernweg, and will not be able to serve the “Bützfleth, Holunderweg„ stop. Passengers are requested to use the replacement stop on Flethstraße near house number 101. Line 2075 will remain on Moorchaussee and will not be able to serve the “Bützfleth, Holunderweg" stop. Passengers are requested to use the replacement stop on Flethstraße near house number 101.

Read more "

Routes 2038, 4037 and 4623 | Construction work in Hollenstedt: 13 April 2026 – 31 March 2027

From 13 April 2026 to 31 March 2027, Dierstorfer Straße in Hollenstedt will be closed due to roadworks. As a result, routes 4037 and 4623 will be diverted via Am Schäferstieg, Amselweg, Wennerstorfer Kirchweg, Wennerstorfer Weg, Oldendorfer Straße, Estetalstraße, Breitensteiner Allee, Dierstorfer Straße and Am Glockenberg. ➡️ The stops „Dierstorf, Am Schulberg“ (towards Hollenstedt) and „Hollenstedt, Wiesenweg“ cannot be served during this period.Please use the stop on Am Schäferstieg instead. ℹ️ The „Hollenstedt, Schulzentrum“ stop will be served by all journeys on route 4037.The stops along the diversion route will be served as required. Addendum: 19 October – 23 October 2026 During this period, the road closure will be extended (additional construction phase). Breitensteiner Allee will then also be affected and will no longer be passable. Route 4037 will follow an additional diversion via Professor-Kück-Straße, Moisburger Straße and Estetalstraße. ➡️ The following stops will be omitted during this period: „Dierstorf, Am Schulberg“ (towards Hollenstedt) „Hollenstedt, Wiesenweg“ „Hollenstedt, Schulzentrum“ „Hollenstedt, Breitensteiner Allee (South)“ „Hollenstedt, Breitensteiner Allee“ „Hollenstedt, Siedlung“ Please use the „Am Schäferstieg“ stop and the temporary stop on Estetalstraße instead. ℹ️ Stops along the diversion route will be served as required. Bus route 2038 is being diverted via Estetalstraße, Moisburger Straße, Hauptstraße, Tostedter Straße and Am Stinnberg. ➡️ The „Hollenstedt, Breitensteiner Allee“ stop cannot be served. Passengers are asked to use the „Hollenstedt, Am Mühlenberg“ and “Hollenstedt, Schulzentrum” stops instead.

Read more "

Lines 2040, 2043, 2044, 2720 and 2726 | Construction work in Hinterbrack: 24 March – 30 October 2026

From 24 March 2026 to 30 October 2026, construction work will be taking place at Deichsiel in Hinterbrack, near the „Hinterbrack, Hinterbrack 7“ stop. Due to traffic congestion causing delays, routes 2720 and 2726 will operate on temporary timetables. You can find these here. ➡️ The „Hinterbrack, Hinterbrack 7“ stop cannot be served during this period. Please use the following instead: towards Cranz, the alternative stop approximately 150 metres to the east; towards Jork, the „Hinterbrack, Wellenstraße“ stop.“

Read more "