
Here we go: The Heide Shuttle will be running again from 3 July!
The new Heide Shuttle season starts on 3 July 2025! Until 3 October you can travel for free every day
The new Heide Shuttle season starts on 3 July 2025! Until 3 October you can travel for free every day
On Sundays, 30 March, 28 September and 2 November 2025, the Am Sande square in Lüneburg will be closed due to Sunday shopping. Lines 5002, 5003, 5005, 5007, 5008, 5009, 5011, 5012, 5013, 5014, 5015, 5016, 5020, 5200, 5600 and 5700 will take diversions. Lines 5002, 5003, 5005, 5007, 5008, 5009, 5011, 5013, 5015, 5020 and 5200 will be diverted via Willy-Brandt-Straße and Stresemannstraße and will not be able to serve the "Lüneburg, Am Sande" stop. Passengers should use the alternative stop "Lüneburg, Rote Straße/Clamartpark". Line 5012 will take a diversion via Willy-Brandt-Straße and Stresemannstraße and will not be able to serve the "Lüneburg, Am Sande" stop. Passengers should use the stops "Lüneburg, ZOB" or "Lüneburg, Rotes Tor". Lines 5014 and 5016 will take a diversion via Willy-Brandt-Straße, Stresemannstraße, Rote Straße, Wallstraße, Sülztorstraße and Lindenstraße and will not be able to serve the "Lüneburg, Am Sande" stop. Passengers should use the alternative stop "Lüneburg, Rote Straße/Clamartpark". Lines 5600 and 5700 will take a diversion via Willy-Brandt-Straße and Stresemannstraße and will not be able to serve the "Lüneburg, Am Sande" stop. Passengers should use the stops "Lüneburg, ZOB" and "Lüneburg, Stadttheater".
From 14 April to 11 August 2025, the Neuenfelder Fährdeich in Hamburg-Neuenfelde will be closed due to road and sewer construction work. Lines 257, 550, 2650 and 4750 will therefore be detoured. ➡️ There are construction site timetables for the construction site - you can find them here. In detail: In the first construction phase from 14 April to 21 May 2025, the Neuenfelder Fährdeich between Marschkamper Deich and Neuenfelder Damm will be closed. Route 4750 will take a diversion via Nincoper Straße, Domänenweg and Neuenfelder Fährdeich and will not be able to serve the "Hamburg, Marschkamper Deich" stop. The stop "Hamburg, Nincoper Straße 160" will be served as a replacement. Between 1 May and 6 May 2025, the Elbe cycle touring bus will take a diversion via Königreich and Cranz and will not be able to serve the "Hamburg, Marschkamper Deich" stop. In the second construction phase from 22 May to 25 July 2025, the Neuenfelder Fährdeich will be closed between Neuenfelder Damm and Alter Fährweg. Lines 257 and 550 will take a diversion via Alter Fährweg, Neuenfelder Fährdeich, Domänenweg, Nincoper Straße, Marschkamper Deich and Neuenfelder Fährdeich and will not be able to serve the stops "Hamburg, Alter Fährweg", "Hamburg, Sietas", "Hamburg, Neuer Fährweg" and "Hamburg, Neuenfelder Fährdeich (OST)". Line 2723 will take a diversion via Nincoper Straße, Marschkamper Deich and Neuenfelder Fährdeich and will not be able to serve the stops "Hamburg, Liedenkummer Bogen", "Hamburg, Sietas" and "Hamburg, Neuer Fährweg". The "Hamburg Seehof" stop will be served as a replacement.
From 26 May to 13 August 2025, district road 59 and the Schmalenfelde-Mühle road in Schmalenfelde will be closed due to road and bridge construction work. Lines 4408, 4611 and 4631 will therefore take a diversion. ➡️ There are construction site timetables for the roadworks - you can find them here. In detail: journeys 5804 and 6812 on route 4408 are being diverted via Asendorf and serve the stop between "Asendorf, Zum Auetal" and "Marxen, Dorfteich" in reverse order. The stop "Schmalenfelde, Mühle" cannot be served. Passengers should change to the stop "Schmalenfelde, Abzweig Brackel". Journey 1816 on route 4408, journeys 1450, 1470, 1473, 1479, 1480 and 1502 on route 4611 and journeys 2418, 2420 and 2434 on route 4631 will take a diversion via Lindenallee, Marxener Straße and Dorfstraße and will not be able to serve the "Schmalenfelde, Mühle" stop. Journeys 1450, 1473 and 1502 on route 4611 and journeys 2418, 2420 and 2434 on route 4631 will also be diverted via Quarrendorf. Journey 1473 on route 4611 and journeys 2418, 2420 and 2434 on route 4631 will not be able to serve the "Hanstedt, Hingstkamp" stop. Journeys 2418, 2420 and 2434 on route 4631 will not be able to serve the stops "Schmalenfelde, Abzweig Brackel", "Hanstedt, Hansenbarg" and "Hanstedt, Im Bultmoor".
From 2 June to 16 November 2025, Kirchstraße in Barendorf will be closed due to the expansion of the cycle path. Route 5362 turns at the roundabout at the eastern end of Wendhausen and takes a diversion via Reinstorf and the B216 federal road. ➡️ The bus stop "Sülbeck, An den Eichen (L221)" cannot be served during this time.
From 2 June to 15 August 2025, Im Sande street in Harsefeld will be closed due to the laying of a drinking water pipe. Lines 2301 and 2303 will take a diversion via Schulstraße and Buxtehuder Straße. ➡️ The stops "Harsefeld, Grashofweg", "Harsefeld, Koppelweg", "Harsefeld, Roggenkamp" and "Harsefeld, Im Sande 96" cannot be served during this time. Please use the stops "Harsefeld, Auebrücke", "Harsefeld, Hellwege-Allee" and "Harsefeld, Handelsweg" instead.
From 16 June to 1 August 2025, the intersection of Etzener Weg, Ehlbecker Weg and Büntstraße in Rehlingen will be closed due to construction work. Line 5702 will therefore take a diversion via Hauptstraße. ➡️ The bus stop "Rehlingen, Ehlbecker Weg" cannot be served during this time. Please use the alternative stop in Hauptstraße, at number 30, instead.
From 19 May to 25 July 2025, Fredenbeker Straße, Im Bokel and Dinghorner Straße (district road 70) in Kutenholz will be closed between Im Ellerbusch and Dinghorner Straße in Kutenholz due to construction work in six construction phases. ➡️ There are roadworks timetables for the construction site - you can find them here. In detail: The lines 2370, 2371 and 2725 cannot serve the stops "Fredenbeck, Dinghorn" and "Fredenbeck, Kutenholzer Weg". The stop "Wedel (STD), Mulsumer Weg" will be served additionally.
From 23 June to 30 September 2025, the intersection of Kanalplatz and Harburger Schloßstraße in Hamburg-Harburg will be closed due to the construction of a new roundabout. Route 149 in the direction of Harburg will take a diversion via Schellerdamm and Karnapp. ➡️Die stops "Hamburg, Kanalplart" and "Hamburg, Harburger Schloßstraße" cannot be served during this time. Please use the stops "Hamburg, Schellerdamm" and "Hamburg, Karnapp" instead.
From 24 March to 31 December 2025, Maschener Straße in Hittfeld will be closed in 8 construction phases due to the repair of all pipes. Construction sections 1 - 4 are from 24 March to 8 August 2025 and will be closed between Winsener Landstraße and Borsteler Feld Straße. Lines 347, 348 and 448 will therefore take a diversion via Winsener Landstraße and Karoxbosteler Chaussee. Lines 347 and 448 will continue on the diversion via Bosteler Feld to Maschener Straße. Lines 348 will turn round at the turning area in the northern section of Bosteler Feld. ➡️ The bus stop "Hittfeld, Bosteler Feld" cannot be served during this time. Please use the alternative stop in Borsteler Feld street between the turning area and Karoxbosteler Chaussee instead.
KVG Stade GmbH & Co. KG
Harburger Street 96
21680 Stade
Copyright KVG Stade GmbH & Co. KG