[t4b-ticker]

Lines 2101 and 2724 | Construction work in Buxtehude: 13.04. - 08.05.2026

From the 13 April 2026 until 08 May 2026 is the Konrad-Adenauer-Allee in Buxtehude because of the Complete refurbishment of the „Buxtehude, Konrad-Adenauer-Allee SZ Nord“ stop“ is closed on one side and One-way street in the direction of the railway station set up.


Line 2101

The line runs in the direction of Buxtehude, ZOB a modified line routing as Round trip clockwise via Harburger Straße and Konrad-Adenauer-Allee (like the opposite direction).

➡️ The stops are displayed on the opposite side of the street and in reverse order served.
After the stop „Konrad-Adenauer-Allee SZ North“ the journey continues to the „Buxtehude, ZOB“.


Line 2724

The line runs in the direction of Airbus a diversion via Brillenburgsweg, Alter Postweg, Ostmoorweg and Harburger Straße.

➡️ The stops „Buxtehude, Konrad-Adenauer-Allee SZ North“ and „Buxtehude, Im Obstgarten“ cannot be operated.
Please use the Replacement stop in Brillenburgsweg at the level of house number 2a.