[t4b-ticker]

Line 4200 | Construction work in Buchholz in der Nordheide: 23.11.2025

On 23 November 2025 between 09:00 and 12:00 is the Carpenter Street in Buchholz in the North Heath because of Road construction work locked.

The Line 4200 therefore takes a diversion via the Federal Highway 75 and the Steinecker Street.

➡️ The stops „Buchholz, industrial estate south“ and „Buchholz, Zimmererstraße“ cannot be served during this time.
Please use the stop „Steinbeck, Eichholz“.