From the 16 July to 17 July 2025 is the Ahlerstedter Weg in Ahrensmoor because of Construction work locked.
The Line 2035 therefore takes a diversion via the County road 75.
➡️ The bus stop "Ahrensmoor-West, Ahlerstedter Weg" cannot be operated during this time.
Please use the bus stop instead "Ahrensmoor-North, Schlangenweg".