From the 01 July until 18 July 2025 is located on the Federal highway 73 one Construction site.
The Line 1824 can therefore use the stop "Wingst-Höftgrube, Wingst railway station" in both directions do not operate.
➡️ Please use the bus stop instead "Wingst-Geestberg, junction Schwimmbadallee".