[t4b-ticker]

Lines 347, 348, 448 and 4148 | Construction work in Hittfeld: 24.03. - 31.12.2025

From the 24 March to 31 December 2025 is the Maschener Straße in Hittfeld because of the Basic repair of all pipes in 8 construction phases locked.
From the 14 August until 31 December 2025 this concerns the Construction phases 5-9. During this time, the Maschener Straße between Bosteler Feld and An der Reitbahn locked.

  • Line 4148 - Branch line to „Hittfeld, Bosteler Feld“:
    ➡️ Diversion via Schützenstraße, Karoxbosteler Chaussee and Bosteler Feld.
    🚫 Stops „Hittfeld, Theodor-Fontane-Straße“, „Hittfeld, Uhlandstraße“ and „Hittfeld, Rieselwiesen“ not applicable.
    🚌 Passengers please switch to „Hittfeld, Bosteler Feld“ and „Hittfeld, Church“ from.
    ℹ️ For the Branch line to Jesteburg exist No restrictions.

  • Lines 347, 448 and 647:
    ➡️ Diversion via Bosteler Feld, Karoxbosteler Chaussee and Schützenstraße (partly further via Hittfelder Schulstraße, Bahnhofstraße and Am Göhlenbach).
    🚫 Stops „Hittfeld, Theodor-Fontane-Straße“, „Hittfeld, Uhlandstraße“ and „Hittfeld, Rieselwiesen“ not applicable.
    🚌 Passengers please switch to „Hittfeld, Church“ from.