{"id":1889,"date":"2026-04-17T10:44:38","date_gmt":"2026-04-17T08:44:38","guid":{"rendered":"https:\/\/kvg-bus.de\/heidekreis\/linien-1002-1007-1008-1010-1014-1020-1021-1023-1024-und-1027-bauarbeiten-in-cuxhaven-27-04-12-06-2026-2\/"},"modified":"2026-08-12T09:55:03","modified_gmt":"2026-08-12T07:55:03","slug":"lines-1002-1007-1008-1010-1014-1020-1021-1023-1024-and-1027-construction-work-in-cuxhaven-27-04-12-06-2026-2","status":"publish","type":"post","link":"https:\/\/kvg-bus.de\/heidekreis\/en\/linien-1002-1007-1008-1010-1014-1020-1021-1023-1024-und-1027-bauarbeiten-in-cuxhaven-27-04-12-06-2026-2\/","title":{"rendered":"Lines 1044, 1046, 1052, 1053 and 1054 | Construction work in Lamstedt: 30 April \u2013 23 December 2026"},"content":{"rendered":"
From the 30 April 2026<\/strong> until 23 December 2026<\/strong> are the Bremerv\u00f6rder Stra\u00dfe<\/strong> and the Large street<\/strong> in Lamstedt<\/strong> because of Road construction work<\/strong> closed in several construction phases.<\/p>\n During these periods, the roads are south of the junction with Feldstrasse<\/strong> locked.<\/p>\n The Line 1046<\/strong> takes a diversion via Field road<\/strong> and Sch\u00fctzenstra\u00dfe<\/strong>.<\/p>\n \u27a1\ufe0f The stops \u201eLamstedt, Pappelweg<\/strong>\u201c and \u201eNindorf, Kirchweg<\/strong>\u201c cannot be operated.<\/p>\n During this period, the Large street<\/strong> between the intersections with the Mittelstenaher Stra\u00dfe<\/strong> and the Kleine Strasse<\/strong> locked.<\/p>\n The Lines 1044, 1046, 1052, 1053 and 1054<\/strong> take a diversion via Small street<\/strong>, Field road<\/strong> and Sch\u00fctzenstra\u00dfe<\/strong>.<\/p>\n \u27a1\ufe0f The stops \u201eLamstedt, Church<\/strong>\u201c, \u201eLamstedt, Pappelweg<\/strong>\u201c and \u201eNindorf, Kirchweg<\/strong>\u201c cannot be operated.<\/p>","protected":false},"excerpt":{"rendered":" From 30 April 2026 to 23 December 2026, Bremerv\u00f6rder Stra\u00dfe and Gro\u00dfe Stra\u00dfe in Lamstedt will be closed in several sections due to roadworks. Construction phases 3 and 4 (30 April \u2013 2 July 2026) Construction phases 1 and 2 (12 August \u2013 23 December 2026) During these periods, the roads south of the junction with Feldstra\u00dfe will be closed. Bus route 1046 will follow a diversion via Feldstra\u00dfe and Sch\u00fctzenstra\u00dfe. \u27a1\ufe0f The \u201eLamstedt, Pappelweg\u201c and \u201eNindorf, Kirchweg\u201c stops cannot be served. Construction phase 5 (2 July \u2013 14 August 2026) During this period, Gro\u00dfe Stra\u00dfe will be closed between the junctions with Mittelstenaher Stra\u00dfe and Kleine Stra\u00dfe. Routes 1044, 1046, 1052, 1053 and 1054 will follow a diversion via Kleine Stra\u00dfe, Feldstra\u00dfe and Sch\u00fctzenstra\u00dfe. \u27a1\ufe0f The stops \u201eLamstedt, Kirche\u201c, \u201eLamstedt, Pappelweg\u201c and \u201eNindorf, Kirchweg\u201c cannot be served.<\/p>","protected":false},"author":10,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[74,33],"tags":[],"class_list":["post-1889","post","type-post","status-publish","format-standard","hentry","category-cuxhaven","category-fahrplanabweichungen"],"yoast_head":"\n
\nConstruction phases 3 and 4 (30.04. - 02.07.2026)<\/h3>\n
Construction phases 1 and 2 (12.08. - 23.12.2026)<\/h3>\n
\nConstruction phase 5 (2 July \u2013 14 August 2026)<\/h3>\n