{"id":1840,"date":"2026-02-24T13:54:32","date_gmt":"2026-02-24T12:54:32","guid":{"rendered":"https:\/\/kvg-bus.de\/heidekreis\/linie-255-bauarbeiten-in-frielingen-23-02-30-05-2026\/"},"modified":"2026-02-24T13:54:32","modified_gmt":"2026-02-24T12:54:32","slug":"line-255-construction-work-in-frielingen-23-02-30-05-2026","status":"publish","type":"post","link":"https:\/\/kvg-bus.de\/heidekreis\/en\/linie-255-bauarbeiten-in-frielingen-23-02-30-05-2026\/","title":{"rendered":"Line 255 | Construction work in Frielingen: 23.02. - 30.05.2026"},"content":{"rendered":"
From the 23 February 2026<\/strong> until 30 May 2026<\/strong> is the County road 17<\/strong> in Frielingen<\/strong> because of Construction work<\/strong> locked.<\/p>\n The Line 255<\/strong> does not travel to Frielingen railway station<\/strong> and to the Frielingen housing estate<\/strong>.<\/p>\n \u27a1\ufe0f The stops \u201eFrielingen, settlement no. 35<\/strong>\u201c, \u201eFrielingen, settlement no. 39<\/strong>\u201c and \u201eFrielingen, railway station<\/strong>\u201c cannot be operated.<\/p>","protected":false},"excerpt":{"rendered":" From 23 February 2026 to 30 May 2026, district road 17 in Frielingen will be closed due to construction work. During this time, route 255 will not run to Frielingen station and the Frielingen housing estate. \u27a1\ufe0f The stops \u201eFrielingen, Siedlung Nr. 35\u201c, \u201eFrielingen, Siedlung Nr. 39\u201c and \u201eFrielingen, Bahnhof\u201c cannot be served.<\/p>","protected":false},"author":10,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[75,33],"tags":[],"class_list":["post-1840","post","type-post","status-publish","format-standard","hentry","category-heidekreis","category-fahrplanabweichungen"],"yoast_head":"\n