{"id":1768,"date":"2025-11-27T13:50:59","date_gmt":"2025-11-27T12:50:59","guid":{"rendered":"https:\/\/kvg-bus.de\/heidekreis\/linie-2007-bauarbeiten-in-stade-14-12-2025-31-07-2027\/"},"modified":"2025-11-27T13:50:59","modified_gmt":"2025-11-27T12:50:59","slug":"line-2007-construction-work-in-stade-14-december-2025-31-july-2027","status":"publish","type":"post","link":"https:\/\/kvg-bus.de\/heidekreis\/en\/line-2007-construction-work-in-stade-14-december-2025-31-july-2027\/","title":{"rendered":"Line 2007 | Construction work in Stade: 14.12.2025 - 31.07.2027"},"content":{"rendered":"
Since 4 July 2025, half of Harburger Stra\u00dfe in Stade has been closed in the area of the bridge over the railway line towards Bremerv\u00f6rde. \nThe lines operating there can continue to pass through the construction site.<\/p>\n
For the period from 14 December 2025 to 31 July 2027 <\/strong>A construction site timetable with extended journey times will apply. You can find this here. here<\/a>.<\/p>\n