{"id":1981,"date":"2026-06-16T14:22:07","date_gmt":"2026-06-16T12:22:07","guid":{"rendered":"https:\/\/kvg-bus.de\/harburg\/linien-2301-und-2302-bauarbeiten-in-harsefeld-22-06-05-09-2026\/"},"modified":"2026-06-16T14:22:25","modified_gmt":"2026-06-16T12:22:25","slug":"lines-2301-and-2302-construction-work-in-harsefeld-22-06-05-09-2026","status":"publish","type":"post","link":"https:\/\/kvg-bus.de\/harburg\/en\/linien-2301-und-2302-bauarbeiten-in-harsefeld-22-06-05-09-2026\/","title":{"rendered":"Routes 2301 and 2302 | Construction work in Harsefeld: 22 June \u2013 5 September 2026"},"content":{"rendered":"
From Monday 22 June until, it is expected, 5 September 2026, the road \u201eIm Sande\u201c in Harsefeld will be closed between the junction with \u201eAm Bauhof\u201c and the roundabout (junction with Buxtehuder Stra\u00dfe) due to roadworks. Citizens\u2019 bus routes 2301 and 2302 will be diverted via Roggenkamp, M\u00e4des\u00fc\u00dfweg and Kohldistelstra\u00dfe and will not be able to serve the \u2018Harsefeld, Im Sande 96\u2019 stop. Please use the \u2018Harsefeld, Handelsweg\u2019 stop instead.<\/p>","protected":false},"excerpt":{"rendered":"
From Monday 22 June until, it is expected, 5 September 2026, the road \u201eIm Sande\u201c in Harsefeld will be closed between the junction with \u201eAm Bauhof\u201c and the roundabout (junction with Buxtehuder Stra\u00dfe) due to roadworks. Citizens\u2019 bus routes 2301 and 2302 will be diverted via Roggenkamp, M\u00e4des\u00fc\u00dfweg and Kohldistelstra\u00dfe and will not be able to serve the \u2018Harsefeld, Im Sande 96\u2019 stop. Please use the \u2018Harsefeld, Handelsweg\u2019 stop instead.<\/p>","protected":false},"author":9,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[74,33],"tags":[],"class_list":["post-1981","post","type-post","status-publish","format-standard","hentry","category-stade","category-fahrplanabweichungen"],"yoast_head":"\n