[t4b-ticker]

Lines 2301 and 2302 | Construction work in Harsefeld: 08.12. - 19.12.2025

From the 08 December 2025 until 19 December 2025 is the road In the sand in Harsefeld because of the Laying a drinking water pipe locked.

The Lines 2301 and 2302 therefore take a diversion via the School road and the Buxtehuder Straße.

➡️ The stops „Harsefeld, Grashofweg“, „Harsefeld, Koppelweg“, „Harsefeld, Roggenkamp“ and „Harsefeld, Im Sande 96“ cannot be served during this time.
Please use the stops „Harsefeld, Auebrücke“, „Harsefeld, Hellwege-Allee“ and „Harsefeld, Handelsweg“.