{"id":352,"date":"2026-03-27T11:08:50","date_gmt":"2026-03-27T10:08:50","guid":{"rendered":"https:\/\/kvg-bus.de\/linien-4037-und-4623-bauarbeiten-in-hollenstedt-13-04-2026-31-03-2027-3\/"},"modified":"2026-04-08T11:27:22","modified_gmt":"2026-04-08T09:27:22","slug":"lines-4037-and-4623-construction-work-in-hollenstedt-13-04-2026-31-03-2027-3","status":"publish","type":"post","link":"https:\/\/kvg-bus.de\/en\/linien-4037-und-4623-bauarbeiten-in-hollenstedt-13-04-2026-31-03-2027-3\/","title":{"rendered":"Lines 2101 and 2724 | Construction work in Buxtehude: 13.04. - 08.05.2026"},"content":{"rendered":"
From the 13 April 2026<\/strong> until 08 May 2026<\/strong> is the Konrad-Adenauer-Allee<\/strong> in Buxtehude<\/strong> because of the Complete refurbishment of the \u201eBuxtehude, Konrad-Adenauer-Allee SZ Nord\u201c stop\u201c<\/strong> is closed on one side and One-way street in the direction of the railway station<\/strong> set up.<\/p>\n
\u27a1\ufe0f There are construction site timetables for the construction site - you can find these at here<\/a>.<\/p>\n\n