{"id":1570,"date":"2024-09-11T10:37:05","date_gmt":"2024-09-11T08:37:05","guid":{"rendered":"https:\/\/kvg-bus.de\/cuxhaven\/linien-2026-und-2075-sperrung-in-buetzfleth-11-09-2024-bis-31-12-2025\/"},"modified":"2024-09-11T10:37:05","modified_gmt":"2024-09-11T08:37:05","slug":"lines-2026-and-2075-closure-in-buetzfleth-11-09-2024-to-31-12-2025","status":"publish","type":"post","link":"https:\/\/kvg-bus.de\/cuxhaven\/en\/lines-2026-and-2075-closure-in-buetzfleth-11-09-2024-to-31-12-2025\/","title":{"rendered":"Lines 2026 and 2075 | Closure in B\u00fctzfleth: 11.09.2024 to 31.12.2025"},"content":{"rendered":"
From 11 September 2024 to 31 December 2025, Erlenweg in B\u00fctzfleth will be closed due to a dilapidated bridge.<\/p>\n
\u27a1\ufe0f There are construction site timetables for the construction site - you can find these at here<\/a>.<\/p>\n